
Master Plan for the Bike Path Segments 1, 2, 3 + Memorial Park Connector
Houston, TX · Mixed-Use/Transportation · 2017
My contribution
Overview
The 2017 study explored bicycle and pedestrian connections between Uptown and surrounding neighborhoods, including a Memorial Park Connector linking Memorial Drive and Uptown Park Boulevard across Buffalo Bayou. The proposed network connected toward the Northwest Transit Center and White Oak Bayou Trail, with a potential future connection south to the proposed Southwest Transit Center. The approach sought to reuse existing roads, sidewalks, structures, and signaling where feasible, proposing new paths where existing conditions could not meet the study’s bicycle-path requirements.
Network Planning
Site plans and aerial views show how the bike path segments connect Uptown to surrounding neighborhoods.
Bike Path + Bridge
Shared-use paths and bridge designs connect the network across roadways and bayous.
Conceptual design — Terrain Studio, November 2017
Project Information

Next project →