Uptown Connector

Uptown Connector

Master Plan for the Bike Path Segments 1, 2, 3 + Memorial Park Connector

Houston, TX · Mixed-Use/Transportation · 2017

← Return to Work
Role — Co-designer with the principal and Project ManagerStatus — Conceptual master planningPractice — Created while employed by Terrain Studio

Overview

The 2017 study explored bicycle and pedestrian connections between Uptown and surrounding neighborhoods, including a Memorial Park Connector linking Memorial Drive and Uptown Park Boulevard across Buffalo Bayou. The proposed network connected toward the Northwest Transit Center and White Oak Bayou Trail, with a potential future connection south to the proposed Southwest Transit Center. The approach sought to reuse existing roads, sidewalks, structures, and signaling where feasible, proposing new paths where existing conditions could not meet the study’s bicycle-path requirements.

My contribution

  • —Co-designed with the principal and served as Project Manager, contributing to conceptual master planning, presentation coordination, cost estimation, and internal and external team management.
West Loop Bridge — bike path segments and connector site plan
Shared-use bike path at West Loop underpass
Segment 1 — Washington Avenue crossing, aerial and plan
West Loop Aerial
Bridge Elevation

Conceptual design — Terrain Studio, November 2017

Bridge View

Project Information

Year
2017
Status
Conceptual master planning
Client
Uptown Houston District (commissioning context)
Role
Co-designer with the principal and Project Manager
Credit
Created while employed by Terrain Studio