Berkley Riverfront at CPKC Stadium

Berkley Riverfront at CPKC Stadium

Kansas City, MO · Mixed-Use/Civic · 2024

← Return to Work
Role — Landscape design lead · Project management · Multidisciplinary coordinationStatus — Under ConstructionPractice — Project created while employed by Hoerr Schaudt

My contribution

  • —Landscape design lead and project manager for Phase 1 of the riverfront district, assuming design leadership after an initial collaboration with a Hoerr Schaudt partner on the public realm and rooftop amenity decks.
  • —Developed circulation, ADA and year-round programming; paving, materials and lighting; planting, soils and irrigation; on-structure detailing; and water features, pools, shade structures and outdoor kitchens across the public realm and three amenity decks.
  • —Coordinated with the design architects, local production architects, fire department and underground utilities, and directed a multidisciplinary team across agency and engineering disciplines.
  • —As project manager, coordinated design, production, QAQC, communications, billing and client management; during construction administration, responded to RFIs and change orders.
  • —Early rooftop design study: led the design, developed details, directed planting staff and CAD production through markups and review; primary concepts and programming carried forward as the design evolved.
  • —Plaza bench/platform details: developed the detailed design and researched products and materials, directing drawing development and internal review; the initial concept was collaborative.
  • —When the client changed architects at the end of Design Development, I transferred the project’s design history, reset coordination workflows and drawing protocols, and kept the work aligned with the master schedule.

Challenge

Connect a new riverfront district with surrounding neighborhoods and create welcoming public spaces for both event days and everyday use.

Design response

Phase 1 anchors a pedestrian-friendly district around CPKC Stadium, weaving streetscapes, plazas, and vertical amenity decks into public life.

Planning

Aerial and district views show how the riverfront, stadium, and public spaces are organized.

Aerial of the riverfront district
District and stadium context
Phase 1 plaza level site plan

Public Realm

Streetscapes, plazas, and paths connect the district for pedestrians and events.

Current Central Plaza
Streetscape and public realm
Heroes Alley streetscape
Public path amenities
Mixed-use district

Amenity Decks

Elevated decks provide gathering, recreation, and views across the riverfront.

Amenity deck with plaza view

Detail

Early design studies and detailed development of key features.

Early Rooftop Design Study

Concept — design evolved; primary programming carried forward · Project work completed while employed by Hoerr Schaudt

Plaza bench and platform details

Detail design — collaborative concept, developed by John Hreno · Project work completed while employed by Hoerr Schaudt

Project Information

Year
2024
Status
Under Construction
Site area
District: 40 ac · Phase 1: 11 ac
Client
Palmer Square Capital Management, Marquee Development
Role
Landscape design lead · Project management · Multidisciplinary coordination
Architecture
Perkins Eastman (design architect), Klover Architects
Credit
Project created while employed by Hoerr Schaudt

Selected Recognition

  • Design KC Magazine Award

Selected Press

  • TIME Magazine "World's Greatest Places" (2024)
  • Urban Land Institute (ULI) Magazine
  • Kansas City Business Journal
  • FOX 4 Kansas City (WDAF-TV)
  • KCTV5 News
  • KSHB 41 News
T.O.D.

Next project →

T.O.D.