For review

Consolidated questionnaire

Missing or ambiguous information needed to finalize the site and résumé. Existing wording is shown beside each question. Download the PDF, fill it in, and send it back.

  1. 01

    The Lili Group — exact title

    Current wording: "Founder · Principal · Independent Landscape Design Practice." What is your exact title and preferred accurate description at The Lili Group?

  2. 02

    West Coast Design Leadership — per-firm titles + dates

    Current wording: "2017–2022 — Gates Studio · Ground Level Landscape Architecture · Terrain Studio · California · Shanghai." Provide the individual job title and employment dates for each firm.

  3. 03

    National + International Practice — per-firm titles + dates

    Current wording: "2009–2017 — Strata Landscape Architecture · DTJ Design · TFL Design · L&A Design Group · SCI." Provide the individual job title and employment dates for each firm.

  4. 04

    TFL / TFL Design / Terra Ferma — same firm?

    Do TFL, TFL Design, and Terra Ferma refer to the same firm? What is the correct name to display? (Current credits use "Terra Ferma" for Living the Dream and Bird House; the résumé uses "Terra Ferma" / "TFL".)

  5. 05

    Surfer's Paradise / Oak Sanctuary / Spanish Oasis — responsibilities

    Current role label for all three: "Landscape design, garden design, project management." Provide the specific approved short role description for each project.

  6. 06

    Approximately sixteen team members — what arrangement?

    Current wording: "directed staffing, workload and deadlines across roughly sixteen team members over the past four years." Do these represent people coordinated across projects over four years, simultaneous team responsibility, direct reports, or another arrangement?

  7. 07

    Mentorship — two direct reports to PM

    Current wording: "Two of my direct reports have advanced to project manager." What is the precise mentorship contribution (timeline, scope, any other outcomes) you want included?

  8. 08

    Verified business-development results

    Any verified examples of repeat commissions, work secured, fee or budget responsibility, schedule improvements, approvals, or client retention you want included?

  9. 09

    Project dates vs. personal involvement vs. status

    Where these differ, give the project date, your period of involvement, and the latest known status. Examples: Berkley (project 2024 / Under Construction — your involvement period?); Getty Villa (participation 2000–2002, completion 2006); Tributary.

  10. 10

    Awards — names, years, categories, recipients

    For each award, provide the name, year, category/distinction, and whether it recognizes landscape, the overall project, architecture, or the stadium. Current list: Wabi-Sabi (LUXE RED, Architizer A+, Oasis); Living the Dream (AIA California Honor, IDA Honorable Mention); Getty Villa (AIA LA Project Team, AIA New England Honor, Westside Prize Honor, LABC Grand Prize); Berkley (Design KC Magazine Award); T.O.D. (MUSE Gold, AIJ Annual Architectural Design Prize).

  11. 11

    Contribution for projects with thin evidence

    Provide your specific contribution to any project selected for the PDF that does not already have enough support (e.g., Bird House, Tributary if added). You may answer "omit."

  12. 12

    Berkley contribution rewrite — confirm

    Proposed replacement: "Assumed landscape design leadership following the initial concept phase, advancing the public realm and three amenity decks through design development and construction administration." Reorganize the rest into ~4 bullets: design leadership; multidisciplinary coordination; client/project management; construction delivery. Approve this wording, or correct it?

  13. 13

    T.O.D. handoff — correct organization

    Current wording: "handing drawings to the local documentation team for construction detailing." What is the correct organization name and scope for the local documentation team?

  14. 14

    Hoerr Schaudt — 4–5 accomplishment bullets

    Provide four or five factual accomplishment bullets under Hoerr Schaudt, using approved evidence (the résumé currently shows a one-line summary). Keep them truthful and specific.

  15. 15

    PDF project selection — confirm

    Proposed five: Wabi-Sabi House, Living the Dream, Berkley Riverfront, T.O.D., The Getty Villa. Add or drop any (e.g., Beach Tapestry, Tributary, Bird House)?

  16. 16

    Homepage hero overlay

    Current preview: overlay at /20. Approve /20, adjust to another value, or revert to the original /30?

  17. 17

    Dashboard app description

    I cannot edit the Base44 dashboard App Settings description from code — please update it there. Preferred wording: (a) "John Hreno — landscape design, studio leadership and practice growth…" or (b) a "The Lili Group"-led description? Provide your preferred text.

  18. 18

    Claims audit — keep, soften, or remove?

    For each: (i) Berkley "the world's first purpose-built women's professional sports stadium"; (ii) T.O.D. "China's first high-speed railway TOD"; (iii) Tributary "fifty acres of new wetlands now draw local wildlife"; (iv) Wabi-Sabi "restores local desert ecology and retains stormwater"; (v) biography "regenerative design principles to every project." Keep, soften, or remove each?